Commercial dry lining · SFS · Ceilings · Plastering

National commercial dry lining & structural framing specialists

Tier 1 pre-qualified. High performance interior systems, light gauge steel framing and engineering discipline across the UK. Managing contracts from £50k to £1m+.

Elevation drawing of a metal stud partition showing head track, base track, C studs at 600mm centres, acoustic insulation and two layers of plasterboard600 C/C600 C/CPARTITION HTHEAD TRACK, FIXED TO SOFFITC STUD @ 600 C/CACOUSTIC INSULATIONLAYER 1 BOARDLAYER 2 BOARDBASE TRACK + SEALANTRW 55 DB · EI 120DWG REFPP/DL/01NTSPARTITION ELEVATION
Twin layer metal stud partitionPP/DL/01 · NTS

Why main contractors choose PAT Partitions

24 yrs

Industry heritage

Senior leadership delivering commercial dry lining since 2002.

Tier 1

Pre-qualified

Fully accredited members of Constructionline and CHAS Premium Quality & Safety.

100%

Compliance on site

Every fixer holds a valid CSCS card. Every supervisor is SSSTS or SMSTS certified.

£1m+

Package capacity

Labour and material packages reviewed from £50,000 to £1,000,000+.

Specified to the White Book, warranted by the manufacturer

Every configuration we install is a tested, certified system from a UK manufacturer, so building control sign off and warranty buy off are never in question for your client.

  • Fire integrity up to 120 and 180 minutes on multi layer partition systems
  • High decibel acoustic isolation for residential, hotel and clinical separation
  • Line item pricing mapped to manufacturer system codes on every bid
British Gypsum

White Book specifications. Gyproc, GypWall and GypLyner systems.

Siniat

GTEC configurations for partitions, linings and shaftwall.

Knauf

Certified partition, ceiling and external framing systems.

Where we work

From structural core fire protection on high rise to NHBC compliant volume housing. Each sector gets the right system and the right supervision.

  • High rise & tall buildings

    Precision multi level drywall configurations and complex structural core fire protection.

  • Accommodation blocks

    Scalable, fast track internal fit outs for student living and national hotel chains.

  • Healthcare & care homes

    Clean build partitioning that satisfies infection control, impact resistance and patient acoustic privacy.

  • Education

    Time critical refurbishments for schools and higher education, executed inside strict shutdown windows.

  • Housing developments

    Volume residential partitioning and premium skimming compliant with NHBC warranty guidelines.

Sector experience in detail

Pre-qualified before we arrive on site

Estimators vet us once, then stop worrying. These are the credentials behind every package we price.

CredentialStatusWhat it means for your site
ConstructionlineAccredited memberPre-qualification data held on the portal main contractor buyers already use.
CHAS PremiumQuality & Safety certifiedIndependent assessment of our health and safety management and quality systems.
CSCSEvery fixer cardedNo operative comes through your gate without a valid card.
SSSTS / SMSTSAll supervisors certifiedEvery package is directed on site by a certified supervisor or manager.
Public & Employers' LiabilityIn place, high limitCover suited to major commercial sites. Schedules available to estimators on request.
RAMSIssued with every bidDigitally typed risk assessments and method statements, on our header, before onboarding.

More about PAT Partitions and our compliance

How we price a package

Four steps from tender invitation to an itemised bid on your desk.

  1. Receive the package

    Tender invitation, Bill of Quantities, layout drawings and specification matrix land on the estimating desk.

  2. Take off & system mapping

    Every wall, ceiling and lining type is mapped to a certified manufacturer system code.

  3. Itemised quotation

    A fully priced, line by line labour and material bid returned inside your pre-construction deadline.

  4. Mobilise

    Digital RAMS, certified supervision and a carded workforce on site to programme.

Tender invitations and BOQ submissions

Send your package to the estimating desk

Route formal tender packages, Bills of Quantities, drawings and specification matrices straight to paul@patpartitions.com for a competitive, fully itemised quotation.